How To Install Asphalt Roofing

Download Commodity

Download Article

Installing new shingles yourself tin can save considerable time and money. You tin follow the same steps they do to accomplish the aforementioned professional look. Re-doing the shingles on your roof tin help keep your firm in good shape, keep your family unit safe, and protect you from the elements. Larn to prepare the roof for shingles, lay fifty-fifty courses, and install your ridge shingles similar the experts exercise.

  1. 1

    Get the right number of shingles for the job. It by and large takes three bundles of shingles to cover 100 square feet (9.29 foursquare meters). Asphalt shingle "bundles" are actually sealed in packages (the term bundle comes from wooden shingles which actually came tied upwardly with wire in bundles). Mensurate your roof and buy appropriately.

    • Measure the length and width of the private sections of the roof, multiplying them together to make up one's mind the area.[one] Add the areas of each section together, then dissever by 100 to become the correct number of squares. Multiply this number by iii to go the number of bundles you'll demand to purchase.
  2. 2

    Measure the length of a shingle equally it lies across the roof. This volition help determine how the shingles will lay on the roof width. Most cobblestone shingles are iii anxiety (91.4 centimeters) in length. If your roof's width is not an fifty-fifty multiple of the shingle's length, you volition have a partial piece on one end of each row.

    • The lesser row of shingles must hang past the edge of the roof. For a wood shingle roof yous would have to cutting the shingles that become on the edge to create a straight line to accommodate this.

    Advertising

  3. 3

    Remove former shingles and flashing. Starting time removing the shingles at the peak farthest from the trash container or the corner y'all desire to collect the shingles in. Employ a garden fork or a covering shovel to pull them off quickly, utilise the hammer-method and get past paw for a more thorough job. Make sure that you protect the sides of the house and the windows during this process, like past leaning a large piece of plywood against the firm below where y'all are working. Otherwise yous might break a window or damage the siding.

    • Pry upwardly the nails and loosening the ridge caps. Information technology'south okay if you lot don't go all the nails at outset considering yous'll take a hazard to go dorsum through and remove them subsequently.
    • Remove the metallic flashing effectually chimneys, vents, and valleys in the roof. Flashing in the valleys will about e'er be trashed especially. Some roofers will proceed some of the flashing that's in expert shape but it'south probably worth junking information technology all when you've got the chance.
  4. 4

    Clean the roof. Sweep the roof as clean every bit possible. Remove nails that didn't come up earlier. Reattach loose boards in the sheathing. Examine the sheathing for harm and rotted boards, replacing the damaged sections.[ii]

  5. five

    Install underlayment and new flashing. [three] Lay cobblestone, felt-paper, or special waterproof underlayment, such as a cocky healing membrane, over the roof. Some roofers will utilize 15-pound (6.8 kg) roofing paper, which is an constructive method, although the best method is a cocky sealing membrane with a rain screen. Staple this felt downwards, starting at the lowest point of your roof and working upward. Overlap each row at least 3 inches. Use plenty of staples and work carefully to avert tearing the paper. Be generous with the staples while attaching the paper to the roof deck. Use "tin can caps" under staples if the roof may be exposed to wind before shingles are to be practical.

    • Use sticky back ice and water shield as underlayment where ice dams, leaf and twig dams are likely to build up, and at valleys or where the roof ends at a wall (wide metal flashing may as well exist used at that place).
    • Install new flashing. Nail metallic flashing chosen "drip edge" along the bottom edge of the roof deck most the gutters. You will likewise need rake edge flashing for the sides of the roof. Make sure to install flashing effectually the chimneys and walls. These types of flashing are known equally footstep flashing and turn back flashing.
  6. 6

    Choose the kind of starter course you will utilise. Y'all tin can utilize narrow tab-less starter shingles if you bought some (GAF Pro-Offset is i such make) or will be cut your own starter shingles to fit the item projection. Some people like to just accept to buy one multifariousness of shingle and cut them to fit, while others prefer the ease of the pre-cutting starter shingles without tabs.

  7. 7

    Use chalk lines to make a guide for yourself. Depending on the type of shingles you're using and the roof y'all're working on, you may need to marking a chalk guideline showtime vii inches (17.8cm) from the bottom roof edge. In either instance, the glue strip of the starter grade is and so placed along the drip edge and at the rake edges as well.[4]

    • Mark from the left to right edge of the roof and then the chalk line will be seen immediately above each course every bit a guideline. Proceed to chalk additional guidelines based on the width of the shingle through at to the lowest degree four courses (rows) across the roof. When you are laying felt paper, make sure that the lines on the paper are running in a foursquare pattern.

    Advertizing

  1. 1

    Cut your starter-grade shingles if necessary. If you are making your own starter shingles, cutting the tabs off for the "starter course" (bottom row) of shingles. To ready the tabs and lay the starter class, shorten the first starter shingle by 6 inches (or about a half of one tab).[5] Place the mucilage strip at and all along the drip edge equally well as the rake edges. You volition shingle over this starter course, then the lesser grade volition be double thickness.

    • Instead of cutting off all three tabs, you tin besides reverse the shingles for a starter course and so that the entire shingle with tabs turned upward are under your get-go course of shingles. With either method, putting the solid border at the drip edge and cutting 6 inches off the length of first starter shingle prevents the slots between the tabs from lining up with the first regular class laid over the starter, thus non to betrayal the cobblestone roofing paper through the slots of that bottom row.
    • Smash the shingles with no tabs, such as precut Pro-Start shingles,[6] and apply asphalt cement from a caulk gun in many dots along the drip edge under the edge, then press the tab-less shingles downwardly onto the line of cobblestone cement dots with acceptable spaces betwixt the dots. A continuous dewdrop of cobblestone could trap condensation or windblown water under the roofing at some bespeak.
  2. ii

    Cut five different lengths for staggering slots. To make sure you've got the correct sizes to lay courses correctly, cut several sizes of shingles from the three-tab variety you purchased. Cut off one-half tab-width of the first tab to start the first course. Each cut is needed to shift the slots of the shingles on the course of shingles a one/ii tab from aligning with the slots in shingles above and below. Go on all scrap, especially any single tabs for utilize on the ridge cap shingles. Make the following cuts:

    • Cutting a half tab off for your get-go form shingles,
    • Cut off a full tab for your second course shingles
    • Cut one and a half tabs off of your third course shingles,
    • Cut ii tabs off your 4th grade shingles
    • For your fifth course, cut off half of the final tab
    • Keep your sixth course tabs intact
  3. three

    Start laying courses. Nail the "cut off shingle" into identify, about 6 inches from its lower border. Hammer in one nail near 2 inches from each end of each shingle and another smash nigh 1 inch above each cutout. Make sure to continue nails out of the tar strip equally you lot work.

    • The adjacent shingles above should comprehend the nails past about 1 inch vertically. Horizontally, end nails volition exist covered past up to about ane/2 of a tab, of the shingle(southward) above. Exist sure that these nails volition hold the top border of the course of shingles immediately below.
  4. 4

    Put a full shingle up against the cut shingle and nail into identify. Repeat this basic design, alternating shingles across the roof, working toward the right side, using the chalk line to proceed the shingles straight horizontally.

    • Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof, as wind resistance nailing. Some local codes require the 6 nails on all sides.
  5. 5

    Cut the final shingle to the size you need when you reach the end of the row. You can let the excess extend off the side end of the roof and trim it downwards after it is nailed on, if you similar. Keep this process to the 5th row then brainstorm the aforementioned procedure as the showtime row beginning with a full shingle and a chalk mark. Repeat all of the way to the ridge.

    • If information technology is a hip roof, let about a tab width to overhang onto the next section of roof at the hip to help strengthen the articulation in that location.

    Advertizement

  1. 1

    Install the last form. Bend the last course of shingles over the ridge, up to about half-dozen inches, and blast it onto the other side and so that the roofing extends over the acme of the ridge, where nails will exist covered, leaving no exposed nails. However, do not do this if a ridge vent organization is being installed as well. About all modern roofs use ridge venting – the sheeting stops brusk on each side. Finish your concluding shingle row hither, using the hook-blade for cutting. To cover the ridge, install vented cap shingles or continuous ridge vent.

    • Bend single tabs (or special ridge shingles) over the ridge, first at the end putting a bead of asphalt under the first ridge shingle to hold downwards the tab. Nail information technology where the side by side ridge shingle volition cover the nails about an inch horizontally and vertically.
  2. 2

    Install the ridge shingles. With the asphalt granules exposed, across to the other terminate, boom the shingles on both sides of the ridge as before. Cut off the asphalt nail line from a ridge shingle when you get to the other end.

  3. three

    Utilise a heavy bead of cobblestone cement. Dot the cement under and around the border of the terminal ridge shingle where you removed the smash line. Nail at the 4 corners to the end of the ridge and add a little dab of tar to cover the nail heads.

    • As well apply asphalt cement over the nail heads exposed on the final ridge shingle to foreclose water leaks.

    Advert

Add New Question

  • Question

    What are common mistakes people brand when installing new shingles?

    David Bitan

    David Bitan
    Covering Contractor & Maintenance Professional

    David Bitan is a roofing professional, licensed contractor, and the possessor and founder of Bumble Roofing based in Southern California. With over 12 years of construction industry feel, David specializes in restoring, repairing, and maintaining residential, commercial, and industrial roofs. With over 60 years of combined experience, Bumble Covering provides easy, friendly services to structures including residential, commercial, industrial, multi-family, and government buildings along with hospitals, hotels, and churches.

    David Bitan

    Roofing Contractor & Maintenance Professional

    Skilful Answer

  • Question

    Should I put an underlayment underneath my shingles?

    David Bitan

    David Bitan
    Covering Contractor & Maintenance Professional

    David Bitan is a roofing professional, licensed contractor, and the owner and founder of Bumble Roofing based in Southern California. With over 12 years of structure industry experience, David specializes in restoring, repairing, and maintaining residential, commercial, and industrial roofs. With over threescore years of combined experience, Bumble Covering provides piece of cake, friendly services to structures including residential, commercial, industrial, multi-family, and government buildings along with hospitals, hotels, and churches.

    David Bitan

    Roofing Contractor & Maintenance Professional person

    Expert Answer

  • Question

    How do I figure out how many shingles to buy?

    David Bitan

    David Bitan
    Roofing Contractor & Maintenance Professional

    David Bitan is a roofing professional person, licensed contractor, and the owner and founder of Bumble Roofing based in Southern California. With over 12 years of construction industry feel, David specializes in restoring, repairing, and maintaining residential, commercial, and industrial roofs. With over 60 years of combined experience, Bumble Roofing provides like shooting fish in a barrel, friendly services to structures including residential, commercial, industrial, multi-family, and government buildings along with hospitals, hotels, and churches.

    David Bitan

    Roofing Contractor & Maintenance Professional

    Expert Respond

  • Question

    Can I install shingles on a hot day?

    David Bitan

    David Bitan
    Roofing Contractor & Maintenance Professional

    David Bitan is a roofing professional person, licensed contractor, and the possessor and founder of Bumble Roofing based in Southern California. With over 12 years of construction industry experience, David specializes in restoring, repairing, and maintaining residential, commercial, and industrial roofs. With over 60 years of combined experience, Bumble Covering provides piece of cake, friendly services to structures including residential, commercial, industrial, multi-family, and government buildings along with hospitals, hotels, and churches.

    David Bitan

    Covering Contractor & Maintenance Professional

    Expert Answer

  • Question

    Does the nail have to go through the plywood when installing shingles?

    Mark Spelman

    Mark Spelman is a General Contractor based in Austin, Texas. With over 30 years of construction experience, Mark specializes in constructing interiors, project management, and projection interpretation. He has been a construction professional since 1987.

    Mark Spelman

    Construction Professional

    Practiced Answer

  • Question

    Will shingles flatten out after a few days?

    Mark Spelman

    Mark Spelman is a General Contractor based in Austin, Texas. With over xxx years of construction experience, Mark specializes in amalgam interiors, project management, and project estimation. He has been a construction professional since 1987.

    Mark Spelman

    Construction Professional

    Proficient Answer

  • Question

    When is it too cold to shingle a roof?

    Mark Spelman

    Mark Spelman is a General Contractor based in Austin, Texas. With over thirty years of construction feel, Marker specializes in amalgam interiors, project management, and projection estimation. He has been a construction professional person since 1987.

    Mark Spelman

    Construction Professional

    Expert Answer

  • Question

    Where is the exact spot on the shingle to identify the nails?

    Mark Spelman

    Mark Spelman is a Full general Contractor based in Austin, Texas. With over thirty years of construction experience, Marking specializes in constructing interiors, projection management, and project estimation. He has been a construction professional since 1987.

    Mark Spelman

    Construction Professional person

    Expert Answer

  • Question

    Is there a certain temperature to have a new roof put on?

    Mark Spelman

    Marker Spelman is a General Contractor based in Austin, Texas. With over 30 years of construction experience, Marker specializes in amalgam interiors, project direction, and projection estimation. He has been a construction professional since 1987.

    Mark Spelman

    Construction Professional

    Expert Answer

  • Question

    Does the plastic record on the back of shingle demand to be removed?

    Mark Spelman

    Mark Spelman is a General Contractor based in Austin, Texas. With over 30 years of construction feel, Mark specializes in amalgam interiors, project direction, and projection estimation. He has been a construction professional since 1987.

    Mark Spelman

    Construction Professional person

    Proficient Reply

See more than answers

Inquire a Question

200 characters left

Include your email accost to get a message when this question is answered.

Submit

Advertizing

  • Earlier you lot brainstorm to install the asphalt shingles, spread the bundles of shingles out over the roof and so piece of work will period continuously.

  • There is a smaller dashed line of stick down spots which is not ever covered by plastic record that helps at the edge of shingles, but the principal sticky strip is 2 or 3 times bigger, thus stronger and always needs to exist uncovered!

  • Some experts will tell y'all to begin in the eye in a pyramid and work both ways (which allows two shingling workers to piece of work on that aforementioned department) to achieve a more balanced look. Either way is fine.

  • The covering "felt" paper is cobblestone impregnated material that acts as additional waterproofing.

  • In that location are likewise "non-tabbed" shingle (with laminated layers for a simulated wood shingle look) that are, obviously, not "3 tab" merely still require cutting to 5 different lengths for staggering the slots.

Advert

  • On steep roofs, toe-steps should exist nailed to the roof with metallic strips property the toe-steps, to keep you lot and supplies in place -- equally well as using safe ropes and a harness.

  • If your roof is too steep for walking (above a 7/12 slope), utilize roof jacks and planks for safety.

  • Hot weather damage: Exercise not attempt to install asphalt shingles and walk, crawl or stand on them during really hot weather condition.[7] This could cause impairment to the shingles. 1 can work one-half day starting early.

Advert

Things Y'all'll Demand

  • Roof hammers
  • Hammer tack/stapler
  • Chalk box
  • Speed foursquare or framing square
  • Caulking gun
  • Ladders and/or scaffolding
  • Air compressor
  • Pneumatic roll roofing nail gun
  • 5/8-inch (one.6 cm) tacks/staples
  • 1-inch (two.5 cm) minimum roofing nails
  • Tubes of asphalt cement
  • xv-pound (half dozen.8 kg) asphalt roofing paper
  • Metal flashing or preformed drip molding for edges
  • Plenty 3- or four-tab asphalt shingle bundles to complete the roof
  • Premade asphalt ridge shingles

About This Article

Article Summary X

To install asphalt shingles, start by installing underlayment and new flashing on the roof. One time you've done that, cut your shingles to size if they're not already. Then, begin nailing the shingles to the roof, working in rows and starting at the edge of the roof. Install the shingles and so that each one is overlapping the shingle straight beneath it, which volition conceal the nails. When y'all reach the end of a row, cut the last shingle to size before installing it. To learn how to install shingles over the ridge on your roof, curlicue downward!

Did this summary help yous?

Thanks to all authors for creating a page that has been read 626,824 times.

Did this article help you?

Source: https://www.wikihow.com/Install-Asphalt-Shingles

Posted by: hibblerackind.blogspot.com

0 Response to "How To Install Asphalt Roofing"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel